Customization: | Available |
---|---|
Usage: | Electrical Appliance, Machinery, Digital Products, Communication, Vehicle, Toys |
Standard: | Standard |
Still deciding? Get samples of US$ 0.01/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | |
Rating | 16A 125VAC 10A 250VAC |
Ccontact Resistance | 50Ω max |
Insulation Resistance | DC500V |
Dielectric Strength | AC 1000V 1minute |
Cut Out | Depends on |
Protection | |
LED Color | Red/Green/Blue/White/Amber |
Mounting way | Nut |
Frame Material | Nylon |
Terminal | Silver Plated Brass |
Tap position | 2-3 position |
Function | ON-ON,OFF-ON,ON-ON-ON,ETC |
Our Advantages
From the purchase of raw materials to the finished product, all production process (product development/plating/mold and equipment processing/ metalpressing/ plasticinjection/semi-automatic and fully automated equipment assembly, etc.) are completed in the factory. Our metal pressing and plastic injection own the advantages of 100% self-made mold, from a single form to the various forms of application. And we continuously keep innovation and enhance the technology in order to collaborate with our customers to design the most sophisticated products. Yeswitch Electronics Co., Ltd., whether in production base or in quality assurance department in the head office, have professional equipment and technical personnel. In addition to the annual new product development, product improvement and testing are performed as annual plan to ensure that listed products maintain in best quality. Therefore, our long-term customers/partners, get the best quality of the switches.
FAQ |
Q1: When can I get the quotation ? |
A: We are online all day, so you can get quotation within 24h. |
Q2: Can I get free samples? |
A: Yes, after confirming the price, we can provide 5-20 free samples. |
Q3: When can I get the samples? |
A: It depends on the express, generally 3-10 days. |
Q4: Can you accept small order? |
A: Yes, we will try our best to help you with your business. |
Q5: What's the lead time of mass production? |
A: Generally 2-4weeks. We will inform you the delivery time after receiving your payment. |