Customization: | Available |
---|---|
Protection: | Durable, Explosion-Proof, Waterproof, Dust-Proof |
Feature: | Flat |
Still deciding? Get samples of US$ 0.3/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications | |
Contact Rating | 3A 120VAC 28VDC/1A 250VAC |
Insulation Resistance | 1,000 Mfi min. |
Contact Resistance | 20mΩmax. Initial. |
Dielectric Strenngth | 1,000 Vrms min. @sea level. |
Mechanical Life | 50,000 make-and-break cycles. |
Operating Temperature | -30°C to 85°C. |
Materials | |
Case | Diallyl phthalate(DAP) (UL94V-0). |
Contact | Brass or Copper alloy, silver or gold plated. 7MSL/7MDL with gold over silver for plating (See Page 107) |
Plunger | Glass filled Nylon or Glass filled polyester.(PBT) |
Bushing | Brass,nickel plated. |
Housing | Stainless Steel. |
Yeswitch have supply all kinds of switches to global market with the good quality and Competitive price. In recent years, we has expanded our product line from industrial products to consumer goods, catering the need for safety, practicality, and penalization. Customized services are also available upon request.
To maintain competitive edge in the global market, Yeswitch has various testing equipment and ISO 9001 quality system, it is a remarkable manufacturer with outstanding product design and development. Yeswitch products also comply with the ROHS and UL standard and meet the special demands of our customers.
Yeswitch maintains a corporate culture of integrity and honesty and we are always adhere to the three principles for better serve our customers around the globe, ie, meeting global standard, accurate operation, on time delivery.
Our Advantages
FAQ |
Q1: When can I get the quotation ? |
A: We are online all day, so you can get quotation within 24h. |
Q2: Can I get samples? |
A: Yes, after confirming the price, we can provide 5-20 samples. |
Q3: When can I get the samples? |
A: It depends on the express, generally 3-10 days. |
Q4: Can you accept small order? |
A: Yes, we will try our best to help you with your business. |
Q5: What's the lead time of mass production? |
A: Generally 2-4weeks. We will inform you the delivery time after receiving your payment. |